06 / Septic
The tank was due. You are finding that out at night.
The second job is the notebook calendar, after the crew is done. A slipped pump-out is a night you do not get the cabin. Scheduling for due pump-outs, and a draft inspection report from the fields you already capture. County rules stay yours. The agent does not invent a passing grade.

Capture
Tank lid
- Access
- Buried
- Riser
- None
- Due
- This month
The leak
The admin leak here is recurrence. A tank that was due in March gets a call in August, usually after a backup. The first agent is a schedule, not a chatbot.
First agent
Pump-out due list: customers whose last service date plus your interval falls inside the next 30 days. Draft reminder. You approve the send.
Pump-out scheduling
Reads last service and your interval. Proposes a route day. Does not book over a closed calendar.
Inspection report draft
Fills a report from recorded fields and photos. Leaves blanks blank. You sign it.
Stack
ServiceTitan or Jobber for customers and jobs. If the shop is still on a spreadsheet, the assessment says so and we do not pretend an API exists.
It will not
- Certify a system.
- File with the county.
- Guess a tank size that was not recorded.